Factory Supply Universal Power Supply For Led - 5V 3A USB Wall Socket PCB Assembling USB A Fast Charger PD 3.0 PCBA Circuit Board – Adavanced Product Solution Detail:
Detail Information |
|||
Model No: | APS-CB2012 | Product Name: | PCB Assembly For 15W Usb Charger |
---|---|---|---|
Output: | USB A 5V 3A | OEM&ODM: | Available |
Input: | AC100V-240V(Standard) | Efficiency: | >80% |
Application1: | Widly Used As Pcb Prototype And Assembly | Application2: | Support OEM ODM Circuit Board Assembly Services |
Application3: | Custom Circuit Board Assembly Is Acceptable | ||
High Light: |
PD 3.0 PCBA Circuit Board, USB A PCBA Circuit Board, 5V 3A PCB Module Board |
Product Description
Pcba Circuit Fast Charging Usb Charger 5V 3A fast charger PD 3.0 Pcb module
Overview
- Over 100,000pcs/year delivered
- Over 5 models for different currents and ports
- Design service based on customer’s different request
- Components sourcing
- PCB assembly
- Plastic housing production and assemblies
Our Key service include,
- Project developement
- Prototype
- IC programming
- Function test
- Box-building
Specification:
Specifications | |
Model No | APS-CB2012 |
Applications | European Adapter,Australian Charger
UK Adapter, India charger, Travel Adapter, Type C charger, Multi USB chargers, and so on…… |
Technology | Fast Charge, QC 3.0 if you need |
Input | AC100V-240V(Standard)
Contact us for more wider range. |
Output | 15W |
USB A 5V 3A | |
Efficiency(Full load) | >80% |
Safety Protection | Over Voltage Protection
Over Current Protection Short Circuit Protection Over Hot Protection |
Burn in | 100% |
MTBF | 5000Hours |
Features
1. Pcba Circuit moduleOffering 15WSingle USB
2. 5V 3APCBA fast charging
3. Fast charger PD 3.0 Pcb module full with protection function,Output Overvoltage, Overcurrent, Overload, Short Circuit Protection
Lead time:
Quantity(piceces) | 1k~30K | 30K~50K | 50k~100k | over 100k |
Lead time | 20 work days | 30 work days | 40 work days | Negotiation |
Shipping :
1. DHL / UPS / FedEx / TNT , Door-to-Door.2. By Air or by Sea , for FCL; Airport/ Port receiving.3. Customers Specifying Freight Forwarders or Negotiable Shipping Methods.4. We choose the best and safe packaging material to make sure your orders won’t be damaged
during delivery.
Why Choose us
APS offer Electronics Manufacturing Services (EMS) Company in Shenzhen since 2010. With more than 100 highly skilled employees, providing one-stop service of PCBA, including PCB development, PCB manufacturing, component purchasing, assembly, programming, functional test, box-building, and so on.
Any other concerns, welcome to send your request to email.
Your feedback is the most important for us.
Product detail pictures:
Related Product Guide:
The pretty loaded projects management experiences and one to a person support model make the high importance of business enterprise communication and our easy understanding of your expectations for Factory Supply Universal Power Supply For Led - 5V 3A USB Wall Socket PCB Assembling USB A Fast Charger PD 3.0 PCBA Circuit Board – Adavanced Product Solution, The product will supply to all over the world, such as: Dominica, Georgia, Serbia, Please really feel free to send us your requirements and we'll respond to you asap. We have got a professional engineering group to serve for your just about every detailed needs. Cost-free samples could be sent for you personally to understand much more information. In an effort to meet your requires, please really feel free to make contact with us. You may send us emails and contact us directly. Moreover, we welcome visits to our factory from around the globe for much better recognizing of our organization. nd items. In our trade with merchants of numerous countries, we usually adhere for the principle of equality and mutual benefit. It is actually our hope to market, by joint efforts, each trade and friendship to our mutual advantage. We look forward to getting your inquiries.
By Leona from The Swiss - 2017.09.29 11:19
With a positive attitude of "regard the market, regard the custom, regard the science", the company works actively to do research and development. Hope we have a future business relationships and achieving mutual success.
By Klemen Hrovat from Canberra - 2017.04.28 15:45